OEE calculator (overall equipment effectiveness)

Enter the planned production time, the time the machine was stopped, its ideal cycle time and the total and good part counts for the period. The calculator gives OEE and its three factors, the run time and how many good parts were lost against a perfect shift.

min
min
s
OEE71.25 %
Availability
87.5 %
Performance
85.71 %
Quality
95 %
Run time
420 min
Good parts lost against 100 % OEE
6,900

Runs in your browser: nothing you enter is sent anywhere.

How to use it

  1. Enter the planned production time for the period in minutes.
  2. Enter the stop time: breakdowns, changeovers and other unplanned stops in that period.
  3. Enter the ideal cycle time per part in seconds.
  4. Enter the total parts produced and the good ones (right first time, no rework).
  5. Read OEE, availability, performance and quality.

Formulas

  • Run time = planned time − stop time.
  • Availability = run time ÷ planned time.
  • Performance = (ideal cycle time × total count) ÷ run time.
  • Quality = good count ÷ total count.
  • OEE = availability × performance × quality = (good count × ideal cycle time) ÷ planned time.

Worked example

An 8-hour shift with 480 minutes planned, 60 minutes of stops, an ideal cycle time of 1.2 s, 18,000 parts made and 17,100 good:

  • run time 420 min, availability 420 ÷ 480 = 87.5 %;
  • performance 1.2 × 18,000 ÷ (420 × 60) = 21,600 ÷ 25,200 = 85.71 %;
  • quality 17,100 ÷ 18,000 = 95 %;
  • OEE = 0.875 × 0.857143 × 0.95 = 71.25 %.

A perfect shift would give 28,800 ÷ 1.2 = 24,000 good parts, so 6,900 were lost.

Tips

  • Find the biggest loss. The three factors show whether to work on stops, speed or scrap first.
  • Keep the ideal cycle time fixed when comparing periods, or the performance figure is not comparable.
  • Small stops that are not logged show up as lower performance instead of lower availability.

Frequently asked questions

How is OEE calculated?

OEE = availability × performance × quality. Availability is run time ÷ planned time, performance is ideal cycle time × total count ÷ run time, and quality is good count ÷ total count. 87.5 % × 85.71 % × 95 % = 71.25 %.

What counts as planned production time?

The time the equipment is scheduled to produce. Planned breaks, meals and shifts with no orders are left out before the calculation; unplanned stops and changeovers count as lost availability.

Why can performance not exceed 100 %?

It compares the actual output with what the ideal cycle time allows. Above 100 % means the ideal cycle time entered is slower than the machine really runs; use the fastest sustainable cycle time, often the nameplate or design rate.

What is a good OEE?

There is no single standard. OEE is most useful for tracking one machine or line over time and for seeing which of the three losses is biggest.